In the past week, all of the kitchen equipment was installed (not necessarily hooked up); the flooring in the Welcome Gallery is almost fully installed; additional grading was done and the grass seed has been put down behind the building; and the railing on the ramp from the Meeting Room vestibule to the Meeting Room side door was installed.
Contact Shari Loe or Franklin Heller at drww@muuf.org or visit our website to see how you can help or to donate.